Close Menu
Energy Mag
  • Home
  • News
  • Solar
  • Wind Power
  • Baseload
  • Storage
  • Efficiency
What's On

Georgia Power to add 1 GW of solar through new PPAs

September 9, 2025

US onshore wind delivers rare positive news as headaches mount with Trump

September 9, 2025

Trump’s Batman finds his Robin as RFK Jr probes debunked claim wind turbines harm humans

September 9, 2025

RWE debuts offshore wind farm drone to monitor bird and mammals

September 9, 2025

Lithuania suspends offshore wind tender amid concern it may flop again

September 9, 2025
Facebook X (Twitter) Instagram
Energy Mag
  • Home
  • News
  • Solar
  • Wind Power
  • Baseload
  • Storage
  • Efficiency
Facebook X (Twitter) Instagram
Energy Mag
Home » Georgia Power to add 1 GW of solar through new PPAs
Efficiency

Georgia Power to add 1 GW of solar through new PPAs

staffBy staffSeptember 9, 20252 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email
Image by Sebastian Ganso from Pixabay

The Georgia Public Service Commission last week approved five new power purchase agreements (PPAs) for Georgia Power, adding more than 1,000 megawatts (MW) of utility-scale solar capacity across the state.

The projects, totaling 1,068 MW, were selected through the company’s 2023 Clean and Renewable Energy Subscription (CARES) request for proposals, part of the utility’s 2022 integrated resource plan. Each facility will be built and operated by third-party developers under long-term PPAs.

The CARES program is aimed at large commercial and industrial customers that want to match their energy use with renewable generation. Subscriptions provide customers with a share of production from participating facilities.

The approved projects include:

  • Mitchell County: 260 MW, 25-year PPA
  • Coffee County: 200 MW, 30-year PPA
  • Wilkinson County: 183 MW paired with a 91.5 MW battery system, 20-year PPA
  • Jefferson County: 200 MW, 20-year PPA
  • Laurens County: 225 MW, 20-year PPA

Georgia Power has issued a follow-up solicitation, the CARES 2025 RFP, seeking up to 2,000 MW of additional solar or solar-plus-storage resources. Those projects could begin operation as early as 2028.

The utility’s latest integrated resource plan, approved in July, calls for as much as 4,000 MW of new renewable resources by 2035. If fully realized, Georgia Power’s renewable portfolio could grow to about 11,000 MW by 2035, compared with about 3,300 MW online today.

Originally published in Factor This Power Engineering.

Related Articles

US Energy Secretary goes viral for misguided solar post

September 3, 2025

In sign of the times, climate insurance company expands natural disaster coverage for renewable assets

September 2, 2025

Meta invests in SC solar as utilities expect more clean energy-conscious firms to finance projects

August 26, 2025

Can Google reduce it’s AI energy footprint? – This Week in Cleantech

August 22, 2025
Editors Picks

US onshore wind delivers rare positive news as headaches mount with Trump

September 9, 2025

Trump’s Batman finds his Robin as RFK Jr probes debunked claim wind turbines harm humans

September 9, 2025

RWE debuts offshore wind farm drone to monitor bird and mammals

September 9, 2025

Lithuania suspends offshore wind tender amid concern it may flop again

September 9, 2025
Latest Articles

Ocean Winds starts work on next project as French political crisis casts a shadow

September 9, 2025

Envision exec opens up on ambitions for European wind turbine factory

September 9, 2025

‘With respect, bullshit’: Trump official grilled on Orsted stop work order

September 8, 2025
© 2025 Energy Mag. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.