Close Menu
Energy Mag
  • Home
  • News
  • Solar
  • Wind Power
  • Baseload
  • Storage
  • Efficiency
What's On

‘Even in a busy taxi rank, we’d be first’: Will this new vessel be an offshore wind game-changer?

June 27, 2025

Siemens Gamesa chief weighs in on foreign competition as Mingyang circles

June 27, 2025

How a data center company uses stranded renewable energy

June 26, 2025

Huge US offshore wind array receives boost in new court ruling

June 26, 2025

Blade breaks off Vestas V150 turbine in Germany

June 26, 2025
Facebook X (Twitter) Instagram
Energy Mag
  • Home
  • News
  • Solar
  • Wind Power
  • Baseload
  • Storage
  • Efficiency
Facebook X (Twitter) Instagram
Energy Mag
Home » DOE cancels solar giant Sunnova’s $3B loan guarantee
Efficiency

DOE cancels solar giant Sunnova’s $3B loan guarantee

staffBy staffMay 29, 20252 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email
(Credit: Sunnova)

The U.S. Department of Energy has cancelled a $2.92 billion loan guarantee previously committed to residential solar company Sunnova, Reuters reports.

A source who spoke with Reuters claims Sunnova has $371 million in bonds outstanding backed by the cancelled guarantee. Now, the DOE has “de-obligated” the loan guarantee, which removes the requirement for the federal government to continue financing.

The loan guarantee was originally closed in 2023. It was DOE’s first loan guarantee for virtual power plants (VPPs). The former terms of the loan guaranteed up to 90% of $3.3 billion in term loans, which could have resulted in the deployment of 568 MW of solar and storage capacity. The agreement was meant to support Sunnova’s “Project Hestia,” which was intended to make distributed energy resources (DERs), including rooftop solar, battery storage, and VPP-ready software, available to more American homeowners.

Sunset for Sunnova?

Sunnova’s struggles had already been made public before the loan cancellation was announced. Earlier this month, The Wall Street Journal reported that Sunnova Energy International skipped a bond interest payment in April and entered into a 30-day grace period, which expired on May 1. The missed payment was on $400 million in 11.75% senior notes maturing in 2028. Sunnova is reportedly working with stakeholders to reduce debt and increase its financial flexibility ahead of a potential bankruptcy filing and/or a bridge loan to restructure its roughly $8.5 billion in debt outside of a courtroom.

Sunnova recently appointed 41-year-old Ryan Omohundro as chief restructuring officer. Omohundro has about two decades of experience in reworking debt. Last month, Sunnova took out a $185 million loan from KKR & Co. to continue paying independent contractors to install and maintain its solar systems.

In March, Sunnova saw its shares fall 71% after the company cast doubt on its ability to stay in business, and as political tides turn the United States back toward fossil fuels. In its Q4 2024 financial results, Sunnova revealed that customer agreements and incentives rose by 43% ($163 million) but solar system and product sales revenue fell by 13% ($441 million), PV Magazine reports. This reveal followed the announcement from last month that Sunnova would cut around 15% of its workforce, nearly 300 positions, in an effort to focus on efficiency and cash generation.

Related Articles

How a data center company uses stranded renewable energy

June 26, 2025

Gila River tribes intend to float solar panels on a reservoir. Could the technology help the Colorado River?

June 9, 2025

Industry group says Trump tax bill could kill nearly 22,000 solar jobs in Florida

June 5, 2025

July DTECH event addresses challenges faced by Midwest utilities

June 4, 2025
Editors Picks

Siemens Gamesa chief weighs in on foreign competition as Mingyang circles

June 27, 2025

How a data center company uses stranded renewable energy

June 26, 2025

Huge US offshore wind array receives boost in new court ruling

June 26, 2025

Blade breaks off Vestas V150 turbine in Germany

June 26, 2025
Latest Articles

UK snubs $33bn cable plan to pump wind power from Morocco

June 26, 2025

‘Blood in the water’: But Shell denies BP takeover talks

June 26, 2025

UK foreign secretary grilled on Mingyang and turbine ‘kill switches’

June 25, 2025
© 2025 Energy Mag. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.